The Tassie Shoal Projects encompass a single offshore LNG and two world scale offshore Methanol production facilities with Australian Federal Environmental approval to construct the production facilities offshore on Tassie Shoal, a unique shallow water site. The Tassie Shoal Projects were designed to process raw gas from surrounding discovered but undeveloped natural gas fields.


The Tassie Shoal Methanol Project ("TSMP") combines established proven technology in an innovative way to produce methanol from high CO2 feedstock gas. By designing for high CO2 in the feedgas stream,  TSMP avoids the need for expensive separation, transportation and geo-sequestration costs in alternative LNG or domestic sales gas development scenarios.

The TSMP design marries proven technologies of a concrete gravity structure with topsides processing based on Davy Process Technology Steam Methane Reforming (SMR) technology.

The Tassie Shoal site is located adjacent to many discovered but undeveloped high CO2 gas resources in the region. For each TSMP, feedgas of ~200 million standard cubic feet per day (Mscfd) is required, depending upon CO2 content, to enable the production of 5000 tonnes per day (1.75million tonnes per annum) of high quality methanol. Methanol is a chemical building block with numerous industrial application as well as being increasingly used in energy related applications, such as a direct fuel or as an additive to gasoline to produce a high-octane, efficient fuel with lower emissions than conventional gasoline. Methanol gasoline blends have widespread use in China and other countries and is also emerging as a clean fuel for the shipping industry, providing the opportunity for the industry to meet increasingly stringent environmental requirements. 

Tassie Shoal Methanol and LNG Projects

Tassie Shoal LNG Project

The Tassie Shoal LNG Project (TSLNG) offers a commercialisation path to LNG for any of the remote gas resources in the region and is a direct low cost alternative to Floating LNG (FLNG) or onshore facilities.  The key areas for cost savings are  having the facility located close to the source of the gas and having a structure that is fixed to the shallow seabed, avoiding long pieplines and complexities associated with a floating unstable vessel.  The design basis is that liquids would be removed from the raw gas at the field location and dry gas piped to Tassie Shoal for processing into LNG.

Tassie Shoal LNG Project

Submission to Parliamentary inquiry into Australia’s Relations with Timor-Leste

Melbana Energy (formerly MEO Australia) was invited by the Joint Standing Committee on Foreign Affairs, Defence and Trade to make a submission to the inquiry into Australia’s relationship with Timor-Leste in the context of a potential Tassie Shoal LNG project development using Sunrise feedgas.

Tassie Shoal LNG